| How to Use These CCVs | Word (.docx) | The guide: what a CCV is, how to verify and score, the response to a Fail or Non-conformance, frequency, and how to adapt the pack to your site. |
| Contact with Electricity Bowtie | Word (.docx) | Every threat, consequence and critical control on one landscape page, with its key: which controls prevent, which mitigate, which work on both sides, and the supporting controls. |
| CCV-01 Electrical equipment isolated, locked and proved dead before work | Word (.docx) | A four-page field form for one critical control: its bowtie, objective, performance requirements and failure modes, the checklist (Pass, Fail, and Non-conformance on administrative items only), the overall result, actions, talk to the people, and sign-off. |
| CCV-02 Live work only where justified, with the controls for live work in place | Word (.docx) | A four-page field form for one critical control: its bowtie, objective, performance requirements and failure modes, the checklist (Pass, Fail, and Non-conformance on administrative items only), the overall result, actions, talk to the people, and sign-off. |
| CCV-03 Approach distances to overhead powerlines kept | Word (.docx) | A four-page field form for one critical control: its bowtie, objective, performance requirements and failure modes, the checklist (Pass, Fail, and Non-conformance on administrative items only), the overall result, actions, talk to the people, and sign-off. |
| CCV-04 Underground and concealed services located before breaking ground or cutting | Word (.docx) | A four-page field form for one critical control: its bowtie, objective, performance requirements and failure modes, the checklist (Pass, Fail, and Non-conformance on administrative items only), the overall result, actions, talk to the people, and sign-off. |
| CCV-05 Residual current devices fitted and tested | Word (.docx) | A four-page field form for one critical control: its bowtie, objective, performance requirements and failure modes, the checklist (Pass, Fail, and Non-conformance on administrative items only), the overall result, actions, talk to the people, and sign-off. |
| CCV-06 Electrical equipment and leads inspected, tested and taken out of use when damaged | Word (.docx) | A four-page field form for one critical control: its bowtie, objective, performance requirements and failure modes, the checklist (Pass, Fail, and Non-conformance on administrative items only), the overall result, actions, talk to the people, and sign-off. |
| CCV-07 Electrical rescue and resuscitation ready | Word (.docx) | A four-page field form for one critical control: its bowtie, objective, performance requirements and failure modes, the checklist (Pass, Fail, and Non-conformance on administrative items only), the overall result, actions, talk to the people, and sign-off. |
| CCV Schedule | Word (.docx) | Who verifies each control, how often by exposure, the method and the record: in Word, and as an Excel workbook with suggested frequencies, next due dates and status by formula. |
| CCV Schedule | Excel (.xlsx) | Who verifies each control, how often by exposure, the method and the record: in Word, and as an Excel workbook with suggested frequencies, next due dates and status by formula. |