Excavation and Ground Collapse Critical Control Verification Pack

Critical control verification (CCV) checklists for excavation and ground collapse: one four-page CCV form for each of the 5 critical controls that stop the unwanted event, excavation wall or ground collapses onto or around a person, or limit the harm when it happens, with the bowtie, a verification schedule and a guide.

  • HazardExcavations, trenches and the ground around them
  • Unwanted eventExcavation wall or ground collapses onto or around a person
  • Critical controls5: 4 preventing, 1 mitigating
  • FormsOne four-page CCV form per control, the bowtie, a CCV schedule and a guide
  • Task or hazardManaging critical risks
  • JurisdictionNational: check licences and notifications with your regulator
  • FormatsWord and Excel, editable, with PDF copies
  • CodeDOC-EXV-CCV
  • Version1.0 · 3.1 MB ZIP

What is this pack?

The Excavation and Ground Collapse Critical Control Verification Pack is a set of editable critical control verification (CCV) checklists for excavation and trench collapse risks in Australian workplaces, for WHS advisers, managers, supervisors and control owners. It covers 5 critical controls (4 preventing, 1 mitigating) for the unwanted event: excavation wall or ground collapses onto or around a person. It includes 5 four-page CCV forms in Word and PDF, one for each critical control; the Excavation and Ground Collapse Bowtie on one page; the CCV schedule in Word, PDF and Excel; and the guide How to Use These CCVs. It draws on the model Code of Practice Excavation work, cited by title. It supports verification; it is not legal advice.

The 5 critical controls

  1. CCV-01 Ground support in place (shoring, shields, benching or battering) (preventing)
  2. CCV-02 Spoil, plant and materials kept back from the edge (preventing)
  3. CCV-03 Entry only after a competent person has checked the excavation that shift (preventing)
  4. CCV-04 Nearby structures and services supported before they are undermined (preventing)
  5. CCV-05 Rescue and emergency response for a buried worker (mitigating)

About this pack

Most workplaces have controls for excavation and ground collapse: trench shields, shoring, benching, spoil set back from the edge and daily checks. The question is whether they are working today. A critical control verification (CCV) is the proof: a planned check, in the field, that a control that matters most is in place, in good condition, working as designed, used properly and not bypassed.

This pack gives you one CCV form for each of 5 critical controls (4 preventing, 1 mitigating). Each form shows where the control sits on the bowtie, what it must achieve, how it fails, and a checklist grouped by those five checks and then the records. The last page has prompts for talking to the people who use the control.

Every item is Pass or Fail; Non-conformance is kept for administrative items such as records and training dates, and its box is greyed out on the rest. A Fail stops the work that relies on the control and is escalated as a high potential incident. The download holds 5 four-page CCV forms in Word and PDF, one for each critical control; the Excavation and Ground Collapse Bowtie on one page; the CCV schedule in Word, PDF and Excel; and the guide How to Use These CCVs.

Where it applies: Any trench, pit, shaft, bulk excavation or tunnel entrance where people work in or beside it, or where the excavation could undermine nearby structures, roads or services.

What it helps you do

  • Prove, not assume, that the 5 critical controls for excavation and ground collapse are in place and working
  • Score each control the same way every time: Pass, Fail, or Non-conformance for administrative items only
  • Act at once on a Fail, and close every Non-conformance with an owner and a date
  • Hear from the people who use each control where it is skipped or hard to use
  • Report CCV results as a leading indicator, alongside incident data

Each checklist is grouped by

  • It exists: it is there, at this place, for this work, today
  • It is in place and in good condition
  • It functions as designed
  • It is being used properly
  • It is not being bypassed or failing silently
  • Records and administration

The critical controls

Each has its own four-page CCV form. Preventing controls sit on the threat lines of the bowtie and stop the unwanted event; mitigating controls sit on the consequence lines and limit the harm. A control on both sides is one control, verified for both roles.

CCVCritical controlTypeSits onChecklist items
CCV-01Ground support in place (shoring, shields, benching or battering)
Prevent the excavation walls collapsing onto people, with shoring, trench shields, benching or battering suited to the ground and depth, installed before anyone enters and kept in place for as long as people are inside.
PreventingT110 (2 administrative)
CCV-02Spoil, plant and materials kept back from the edge
Keep the extra load off the excavation walls by keeping spoil, materials, plant and vehicles at least [Edge clearance] from the edge, or as the ground support design allows.
PreventingT210 (2 administrative)
CCV-03Entry only after a competent person has checked the excavation that shift
Make sure nobody enters an excavation until a competent person has checked it that shift, and again after rain, vibration, a change in the work or any sign of movement, and that people get out at once when there are warning signs.
PreventingT3, T510 (2 administrative)
CCV-04Nearby structures and services supported before they are undermined
Stop the excavation undermining nearby buildings, walls, footings, roads and services, with underpinning, propping or support designed by a competent engineer and installed before digging reaches their zone of influence.
PreventingT410 (2 administrative)
CCV-05Rescue and emergency response for a buried worker
If a worker is buried or trapped, raise the alarm at once, call emergency services, keep the area safe from a second collapse, and free the worker's head and chest quickly with the equipment on site, without sending untrained people into an unsupported trench.
MitigatingC1, C29 (2 administrative)

Threats

  • T1 Trench or pit walls left unsupported in ground that can fail
  • T2 Spoil, plant, materials or vehicles too close to the edge
  • T3 Water, rain, vibration or time weakens the ground
  • T4 Excavation undermines a nearby building, wall, road or service
  • T5 A person enters the excavation before it has been checked as safe

Consequences

  • C1 Worker buried and killed
  • C2 Worker partly buried: crush injuries or unable to breathe
  • C3 Nearby structure, road or service collapses

Supporting controls, shown dashed on the bowtie with no CCV form: Barriers and covers at the excavation edge (on T5); Monitoring of nearby structures for movement (on C3).

How each form is scored

The same rules in every pack. The worst item decides the overall result.

MarkWhen
PassYou saw it in place and working, today. A Pass is something you saw, not something you remembered or were told.
FailIt is not in place, or it does not work, or it is bypassed. On an administrative item, use Fail only when what you found means the control itself is not there (for example, nobody on the shift is authorised to operate).
Non-conformance (NC)Administrative items only. The control is in place and working, but a supporting element is missing, late or incomplete: a record, a training date, a review date. Fix it as an action.

Non-conformance is offered only on administrative items: records, training currency, plan and review dates, things that would not on their own cause the unwanted event straight away. Every other item checks that the control is physically there and working, so it is Pass or Fail only: its NC box is greyed out.

Overall resultWhenWhat happens
PASSEvery item PassIn place and effective. Record it in the CCV schedule, and check it against hazard reports, near misses and incidents for this control.
NON-CONFORMANCENo Fail; one or more NCIn place, not fully effective. A temporary control first if needed; an action for each NC, with an owner, closed within 30 days. Tell the supervisor and control owner this shift. A repeat NC is investigated.
FAILAny item FailNOT effective. Stop the work that relies on it, make it safe, and tell the supervisor and the escalation contact now. Report it as a high potential incident. Restart only when the control, or a temporary control the risk owner accepts, is in place and verified again.

Talk to the people

The fourth page of every form: five or six prompts written for that control. Talk to at least two people who use, maintain or supervise this control, on the job and in their own words. Ask open questions and listen: they know where it gets skipped, worked around or is hard to use.

  • Anything that suggests the control is missing, bypassed or not working is checked in the field straight away and scored; confirmed, it is a Fail.
  • Everything else that matters goes in the comments, and each thing to fix becomes an action with an owner and a due date.
  • The people spoken to are told what will happen with what they said, and it is never used against them.

What is included

Delivered as one ZIP download. The files below are editable, and the Word documents also come as PDFs. Each download also includes Read Me First, a Product Overview, the Permitted Use Terms and Version Information (PDF).

FileFormatWhat it is for
How to Use These CCVsWord (.docx)The guide: what a CCV is, how to verify and score, the response to a Fail or Non-conformance, frequency, and how to adapt the pack to your site.
Excavation and Ground Collapse BowtieWord (.docx)Every threat, consequence and critical control on one landscape page, with its key: which controls prevent, which mitigate, which work on both sides, and the supporting controls.
CCV-01 Ground support in place (shoring, shields, benching or battering)Word (.docx)A four-page field form for one critical control: its bowtie, objective, performance requirements and failure modes, the checklist (Pass, Fail, and Non-conformance on administrative items only), the overall result, actions, talk to the people, and sign-off.
CCV-02 Spoil, plant and materials kept back from the edgeWord (.docx)A four-page field form for one critical control: its bowtie, objective, performance requirements and failure modes, the checklist (Pass, Fail, and Non-conformance on administrative items only), the overall result, actions, talk to the people, and sign-off.
CCV-03 Entry only after a competent person has checked the excavation that shiftWord (.docx)A four-page field form for one critical control: its bowtie, objective, performance requirements and failure modes, the checklist (Pass, Fail, and Non-conformance on administrative items only), the overall result, actions, talk to the people, and sign-off.
CCV-04 Nearby structures and services supported before they are underminedWord (.docx)A four-page field form for one critical control: its bowtie, objective, performance requirements and failure modes, the checklist (Pass, Fail, and Non-conformance on administrative items only), the overall result, actions, talk to the people, and sign-off.
CCV-05 Rescue and emergency response for a buried workerWord (.docx)A four-page field form for one critical control: its bowtie, objective, performance requirements and failure modes, the checklist (Pass, Fail, and Non-conformance on administrative items only), the overall result, actions, talk to the people, and sign-off.
CCV ScheduleWord (.docx)Who verifies each control, how often by exposure, the method and the record: in Word, and as an Excel workbook with suggested frequencies, next due dates and status by formula.
CCV ScheduleExcel (.xlsx)Who verifies each control, how often by exposure, the method and the record: in Word, and as an Excel workbook with suggested frequencies, next due dates and status by formula.

The technical content paraphrases, and cites by title, Safe Work Australia's model Codes of Practice Excavation work, Construction work and How to manage work health and safety risks, and your geotechnical engineer's advice for the site. Nothing is copied.

Questions about this pack

What is a critical control verification (CCV)?

A planned check, in the field, that one critical control is doing its job: that it exists, is in place and in good condition, functions as designed, is used properly and is not bypassed or failing silently. It is proof, not assumption. It is not a general inspection or audit: it tests one control, in depth, against what it must achieve. A CCV form, or CCV checklist, is the record of that check.

Which critical controls are in the Excavation and Ground Collapse pack?

5 critical controls (4 preventing, 1 mitigating) for the unwanted event: excavation wall or ground collapses onto or around a person. CCV-01 Ground support in place (shoring, shields, benching or battering); CCV-02 Spoil, plant and materials kept back from the edge; CCV-03 Entry only after a competent person has checked the excavation that shift; CCV-04 Nearby structures and services supported before they are undermined; CCV-05 Rescue and emergency response for a buried worker.

What is a bowtie, and is it included?

A bowtie is a one-page diagram of a risk: the threats that could cause the unwanted event on the left, the consequences on the right, and the critical controls on each line. The Excavation and Ground Collapse Bowtie is included in Word and PDF, so you can use it as an editable bowtie template for your site, and each CCV form shows where its control sits on it.

How is a CCV scored?

Pass or Fail on every item. Non-conformance is offered only on administrative items: records, training currency, plan and review dates, things that would not on their own cause the unwanted event straight away. Every other item checks that the control is physically there and working, so it is Pass or Fail only: its NC box is greyed out. Any Fail means the control is not effective: the work that relies on it stops, and it is escalated as a high potential incident. A Non-conformance gets a temporary control if needed and an action closed within 30 days; a repeat is investigated.

What is on the last page of each form?

Talk to the people: five or six prompts written for that control, for the operators, workers and supervisors who use it: what they actually do, when it gets skipped or is hard to use, what has changed, and what they would fix. Anything that suggests the control is missing, bypassed or not working is checked in the field straight away and scored; confirmed, it is a Fail. Everything else that matters goes in the comments, and each thing to fix becomes an action with an owner and a due date.

How often should critical controls be verified?

The CCV schedule (verification schedule) sets how often each critical control is verified, by the exposure where it is used: high (daily exposure, many people or vehicles), medium (weekly, or few people) or low (an occasional task). The guide gives weekly, monthly and quarterly as starting points; each control's own frequencies are set in the schedule. Verify a control in every place it is used, in turn, and more often after a Fail, a near miss or a change, and while an action is open.

Is this pack suitable for my state?

Yes, anywhere in Australia. It is national, written for the WHS and OHS laws generally, with the model Code of Practice Excavation work and other guidance cited by title. Your state or territory may have approved the codes with changes, and some requirements, such as licences, notifying the regulator and registering plant, differ between jurisdictions: check with your regulator. Victoria has its own Occupational Health and Safety Act 2004 and regulations, and WorkSafe Victoria publishes its own guidance.

Can we change the forms?

Yes. Every form, the bowtie and the schedule are editable Word and Excel files: add your logo and business name, your site's limits, plant and roles, delete items that do not apply and add your own. The guide says what to adapt, and how to decide whether a new item may offer Non-conformance.

Is it legal advice, or the same as an audit?

No. These forms help your business prove that its critical controls are in place and working. They do not do that on their own: adapt them to your site, plant and people, verify in the field, and act on what you find. The forms are general information, not legal advice. Work health and safety law differs between jurisdictions and changes over time. Check the requirements that apply where you operate.

Is GST included in the price?

Yes. Every price in the store includes GST, so $149.00 is the total, including $13.55 GST. Your receipt is a tax invoice showing the GST.

How are the files delivered?

As a ZIP download. Card purchases can be downloaded straight away from the confirmation page and by a link we email you. Download links expire after 14 days for security; you can request a new one at any time.

Can we use it at more than one site?

Yes, across your own organisation. The pack is licensed for internal use by the purchasing organisation. A consultant using it with clients needs separate written permission.

What is your refund policy?

Your rights under the Australian Consumer Law are not affected. See the Refund Policy for how we handle a product that is faulty, not as described, or not what you ordered.

Legal information here is general. It may not be correct in your jurisdiction: please check with your local WHS or OHS regulator.

Ordering for a business or several sites? Request an invoice. Other questions: contact us.

Goes with

The documents that set and check the controls for the same work. The audit tools for the code of practice. The plan that sets up the critical risk program these forms verify. The Critical Control Management training packages.

Excavator Safety & Competency Pack

For: Businesses that run excavators

Safe work instruction, VOC assessment, pre-start checklist and a supervisor field verification checklist for excavator and ground worker separation, written to work together.

What's included
  • Excavator safe work instruction
  • Excavator VOC assessment, with an Excel VOC register
  • Pre-start checklist and supervisor field verification checklist
  • Setup guide: what to adapt for your site

Excavation Work Code of Practice Audit Tool

For: WHS advisers, managers, supervisors and health and safety representatives

An Excel audit tool for the code of practice Excavation work, with 31 referenced questions, automatic scores, a dashboard, corrective actions, a field checklist and a report template.

What's included
  • 31 referenced audit questions in 6 chapters
  • Excel workbook with automatic scoring, a dashboard and corrective actions
  • Field audit checklist and audit report template (Word and PDF)
  • Guide: how to rate, evidence and follow up

Construction Work Code of Practice Audit Tool

For: WHS advisers, managers, supervisors and health and safety representatives

An Excel audit tool for the code of practice Construction work, with 29 referenced questions, automatic scores, a dashboard, corrective actions, a field checklist and a report template.

What's included
  • 29 referenced audit questions in 7 chapters
  • Excel workbook with automatic scoring, a dashboard and corrective actions
  • Field audit checklist and audit report template (Word and PDF)
  • Guide: how to rate, evidence and follow up

Critical Risk Management Plan

For: Australian businesses with work that could kill or seriously injure someone, and the officers, managers, supervisors and WHS advisers who manage those risks

A complete, editable critical risk management plan for Australian businesses: find the risks that could kill, map them with bowties, define, own and verify the critical controls, aligned to the model WHS laws and ISO 31000.

What's included
  • The critical risk management plan, a policy, and a roles and accountabilities guide with officers' due diligence
  • A broad-brush workshop guide, an Excel critical risk register that tiers and ranks each risk on the same risk matrix as the WHS plans, and a drawn bowtie template
  • A critical control selection checklist, performance standard template, control owner accountability statement and Excel critical controls register
  • An Excel verification program and schedule, a generic verification form scored Pass, Fail or Non-conformance, an officers' report, a failure response procedure and a dashboard