Workplace health, safety, risk and emergency training · In person and onlinePartner program1800 231 173
Orana Skills Centre
Home / Documents & Templates / CCV packs / Ground Failure and Rockfall
Documents & Templates

Ground Failure and Rockfall Critical Control Verification Pack

Critical control verification (CCV) checklists for ground failure and rockfall: one four-page CCV form for each of the 10 critical controls that stop the unwanted event, uncontrolled fall of ground or rock onto or near people or equipment, or limit the harm when it happens, with the bowtie, a verification schedule and a guide.

  • HazardRock and ground in underground workings, open cut pit walls, benches, highwalls and quarry faces
  • Unwanted eventUncontrolled fall of ground or rock onto or near people or equipment
  • Critical controls10: 6 preventing, 1 preventing and mitigating, 3 mitigating
  • FormsOne four-page CCV form per control, the bowtie, a CCV schedule and a guide
  • Task or hazardManaging critical risks
  • JurisdictionNational: check licences and notifications with your regulator
  • FormatsWord and Excel, editable, with PDF copies
  • Version1.0 · 6.1 MB ZIP

What is this pack?

The Ground Failure and Rockfall Critical Control Verification Pack is a set of editable critical control verification (CCV) checklists for mine ground failure and rockfall risks, for WHS advisers, managers, supervisors and control owners. It covers 10 critical controls (6 preventing, 1 preventing and mitigating, 3 mitigating) for the unwanted event: uncontrolled fall of ground or rock onto or near people or equipment. It includes 10 four-page CCV forms in Word and PDF, one for each critical control; the Ground Failure and Rockfall Bowtie on one page; the CCV schedule in Word, PDF and Excel; and the guide How to Use These CCVs. It draws on the model Code of Practice How to manage work health and safety risks, cited by title. It supports verification; it is not legal advice.

The 10 critical controls

  1. CCV-01 Ground support installed to the standard before people work under it (preventing)
  2. CCV-02 Ground support tested to the testing programme and failures acted on (preventing)
  3. CCV-03 Excavation kept within the geotechnical design (preventing)
  4. CCV-04 Loose rock scaled down before people or plant work under it (preventing)
  5. CCV-05 Barricading and exclusion from unsupported or unstable ground (preventing)
  6. CCV-06 Ground monitoring with trigger action response plans acted on (preventing and mitigating)
  7. CCV-07 Ground inspected after firing, rain or a seismic event before re-entry (preventing)
  8. CCV-08 Falling object protection on plant working under walls or backs (mitigating)
  9. CCV-09 Emergency response and refuge for people trapped by a fall of ground (mitigating)
  10. CCV-10 Catch berms, windrows and rockfall barriers kept effective (mitigating)

About this pack

Most workplaces have controls for ground failure and rockfall: rock bolts, mesh and shotcrete, scaling, barricades at unsupported ground, slope monitoring and catch berms. The question is whether they are working today. A critical control verification (CCV) is the proof: a planned check, in the field, that a control that matters most is in place, in good condition, working as designed, used properly and not bypassed.

This pack gives you one CCV form for each of 10 critical controls (6 preventing, 1 preventing and mitigating, 3 mitigating). Each form shows where the control sits on the bowtie, what it must achieve, how it fails, and a checklist grouped by those five checks and then the records. The last page has prompts for talking to the people who use the control.

Every item is Pass or Fail; Non-conformance is kept for administrative items such as records and training dates, and its box is greyed out on the rest. A Fail stops the work that relies on the control and is escalated as a high potential incident. The download holds 10 four-page CCV forms in Word and PDF, one for each critical control; the Ground Failure and Rockfall Bowtie on one page; the CCV schedule in Word, PDF and Excel; and the guide How to Use These CCVs.

Where it applies: Underground mines, open cut mines and quarries: development headings, drives, stopes and intersections, pit walls, benches, highwalls and quarry faces, wherever people or equipment work under or beside ground that could fail. In Australia, mining has its own work health and safety laws: each state and territory has laws or regulations for mines and quarries, and your site's principal hazard management plans and trigger action response plans come first. The pack gives no design values: every limit is a placeholder for your site's own design criteria and standards.

Where it applies: Underground mines, open cut mines and quarries: development headings, drives, stopes and intersections, pit walls, benches, highwalls and quarry faces, wherever people or equipment work under or beside ground that could fail. Your site's ground control management plan, principal hazard management plan and trigger action response plans come first: use these forms to verify the controls they set.

What it helps you do

  • Prove, not assume, that the 10 critical controls for ground failure and rockfall are in place and working
  • Score each control the same way every time: Pass, Fail, or Non-conformance for administrative items only
  • Act at once on a Fail, and close every Non-conformance with an owner and a date
  • Hear from the people who use each control where it is skipped or hard to use
  • Report CCV results as a leading indicator, alongside incident data

Each checklist is grouped by

  • It exists: it is there, at this place, for this work, today
  • It is in place and in good condition
  • It functions as designed
  • It is being used properly
  • It is not being bypassed or failing silently
  • Records and administration
Goes with this pack 1 related product

Save with the library

The Critical Control Verification Library holds all 17 CCV packs for $999 incl. GST, $1,534 less than buying them separately$908.18 AUD (GST-free outside Australia), $1,394.55 less than buying them separately.

The critical controls

Each has its own four-page CCV form. Preventing controls sit on the threat lines of the bowtie and stop the unwanted event; mitigating controls sit on the consequence lines and limit the harm. A control on both sides is one control, verified for both roles.

CCVCritical controlTypeSits onChecklist items
CCV-01Ground support installed to the standard before people work under it
Hold the ground in place with rock bolts, cable bolts, mesh, shotcrete or other support installed to [Ground support standard], in the right pattern and sequence, before anyone works under or beside it.
PreventingT210 (2 administrative)
CCV-02Ground support tested to the testing programme and failures acted on
Prove that installed ground support performs as designed, by testing it to [Ground support testing programme] (for example pull tests and shotcrete thickness and strength tests), and act on every failed test before people work under that ground.
PreventingT210 (2 administrative)
CCV-03Excavation kept within the geotechnical design
Keep every excavation within [Geotechnical design]: drive, intersection and stope dimensions underground, and bench height, face angle, berm width and overall slope in open cut and quarries, with any change approved by the geotechnical engineer first.
PreventingT110 (2 administrative)
CCV-04Loose rock scaled down before people or plant work under it
Remove loose rock from the backs, walls and faces by mechanical or manual scaling after every firing and whenever loose is found, from a safe position under supported ground or from the protection of a cab, before people or plant work under it.
PreventingT310 (2 administrative)
CCV-05Barricading and exclusion from unsupported or unstable ground
Keep people and plant out of unsupported or unstable ground with physical barricades and exclusion zones: underground at the limit of supported ground and at open stopes and brows; in open cut and quarries below unstable walls, at crests and in rockfall zones set by the geotechnical engineer.
PreventingT410 (2 administrative)
CCV-06Ground monitoring with trigger action response plans acted on
Detect ground movement early with monitoring suited to the site (for example survey prisms, slope radar, extensometers or seismic monitoring) and act on every trigger as the trigger action response plan sets: stop the work that drives the movement and support or unload the ground (preventing), and clear people and plant from the area before it fails (mitigating).
Preventing and mitigatingT5 (preventing); C1, C2 (mitigating)10 (2 administrative)
CCV-07Ground inspected after firing, rain or a seismic event before re-entry
Make sure nobody re-enters an area after firing, heavy rain, a seismic event or a fall of ground until a competent person has inspected the ground and found it safe, as [Re-entry rules] set.
PreventingT610 (2 administrative)
CCV-08Falling object protection on plant working under walls or backs
Protect operators of plant working under walls, faces or backs with a falling object protective structure (FOPS) or protective cab rated for the hazard, kept in good condition and not modified, so that a rockfall onto the plant does not crush the operator.
MitigatingC210 (2 administrative)
CCV-09Emergency response and refuge for people trapped by a fall of ground
If a fall of ground injures, buries or traps people, raise the alarm at once, account for everyone, reach them with trained emergency responders and the right equipment without exposing rescuers to a second fall, and keep people who are cut off alive in a refuge or safe place with air, water and communication until they are reached.
MitigatingC1, C39 (2 administrative)
CCV-10Catch berms, windrows and rockfall barriers kept effective
Stop falling rock reaching people and plant below by keeping catch berms at the width in [Geotechnical design] and clear of spill, and keeping windrows and rockfall barriers in place at the toe of walls and along haul roads and benches below them.
MitigatingC1, C29 (2 administrative)

Threats

  • T1 Ground excavated or mined outside the geotechnical design
  • T2 Ground support missing, below standard or deteriorated
  • T3 Loose rock left on the backs, walls or faces after firing or excavation
  • T4 People or plant enter unsupported or unstable ground
  • T5 Ground movement develops and the warning is not acted on
  • T6 Blasting, water, rain or a seismic event weakens the ground

Consequences

  • C1 Person struck, buried or crushed by falling rock
  • C2 Plant struck or buried with the operator inside
  • C3 People trapped or cut off by a fall of ground

Supporting controls, shown dashed on the bowtie with no CCV form: Geological and geotechnical mapping of each new exposure (on T1); Signs and hazard tags at the limit of supported ground (on T4).

How each form is scored

The same rules in every pack. The worst item decides the overall result.

MarkWhen
PassYou saw it in place and working, today. A Pass is something you saw, not something you remembered or were told.
FailIt is not in place, or it does not work, or it is bypassed. On an administrative item, use Fail only when what you found means the control itself is not there (for example, nobody on the shift is authorised to operate).
Non-conformance (NC)Administrative items only. The control is in place and working, but a supporting element is missing, late or incomplete: a record, a training date, a review date. Fix it as an action.

Non-conformance is offered only on administrative items: records, training currency, plan and review dates, things that would not on their own cause the unwanted event straight away. Every other item checks that the control is physically there and working, so it is Pass or Fail only: its NC box is greyed out.

Overall resultWhenWhat happens
PASSEvery item PassIn place and effective. Record it in the CCV schedule, and check it against hazard reports, near misses and incidents for this control.
NON-CONFORMANCENo Fail; one or more NCIn place, not fully effective. A temporary control first if needed; an action for each NC, with an owner, closed within 30 days. Tell the supervisor and control owner this shift. A repeat NC is investigated.
FAILAny item FailNOT effective. Stop the work that relies on it, make it safe, and tell the supervisor and the escalation contact now. Report it as a high potential incident. Restart only when the control, or a temporary control the risk owner accepts, is in place and verified again.

Talk to the people

The fourth page of every form: five or six prompts written for that control. Talk to at least two people who use, maintain or supervise this control, on the job and in their own words. Ask open questions and listen: they know where it gets skipped, worked around or is hard to use.

  • Anything that suggests the control is missing, bypassed or not working is checked in the field straight away and scored; confirmed, it is a Fail.
  • Everything else that matters goes in the comments, and each thing to fix becomes an action with an owner and a due date.
  • The people spoken to are told what will happen with what they said, and it is never used against them.

What is included

Delivered as one ZIP download. The files below are editable, and the Word documents also come as PDFs. Each download also includes Read Me First, a Product Overview, the Permitted Use Terms and Version Information (PDF).

FileFormatWhat it is for
How to Use These CCVsWord (.docx)The guide: what a CCV is, how to verify and score, the response to a Fail or Non-conformance, frequency, and how to adapt the pack to your site.
Ground Failure and Rockfall BowtieWord (.docx)Every threat, consequence and critical control on one landscape page, with its key: which controls prevent, which mitigate, which work on both sides, and the supporting controls.
CCV-01 Ground support installed to the standard before people work under itWord (.docx)A four-page field form for one critical control: its bowtie, objective, performance requirements and failure modes, the checklist (Pass, Fail, and Non-conformance on administrative items only), the overall result, actions, talk to the people, and sign-off.
CCV-02 Ground support tested to the testing programme and failures acted onWord (.docx)A four-page field form for one critical control: its bowtie, objective, performance requirements and failure modes, the checklist (Pass, Fail, and Non-conformance on administrative items only), the overall result, actions, talk to the people, and sign-off.
CCV-03 Excavation kept within the geotechnical designWord (.docx)A four-page field form for one critical control: its bowtie, objective, performance requirements and failure modes, the checklist (Pass, Fail, and Non-conformance on administrative items only), the overall result, actions, talk to the people, and sign-off.
CCV-04 Loose rock scaled down before people or plant work under itWord (.docx)A four-page field form for one critical control: its bowtie, objective, performance requirements and failure modes, the checklist (Pass, Fail, and Non-conformance on administrative items only), the overall result, actions, talk to the people, and sign-off.
CCV-05 Barricading and exclusion from unsupported or unstable groundWord (.docx)A four-page field form for one critical control: its bowtie, objective, performance requirements and failure modes, the checklist (Pass, Fail, and Non-conformance on administrative items only), the overall result, actions, talk to the people, and sign-off.
CCV-06 Ground monitoring with trigger action response plans acted onWord (.docx)A four-page field form for one critical control: its bowtie, objective, performance requirements and failure modes, the checklist (Pass, Fail, and Non-conformance on administrative items only), the overall result, actions, talk to the people, and sign-off.
CCV-07 Ground inspected after firing, rain or a seismic event before re-entryWord (.docx)A four-page field form for one critical control: its bowtie, objective, performance requirements and failure modes, the checklist (Pass, Fail, and Non-conformance on administrative items only), the overall result, actions, talk to the people, and sign-off.
CCV-08 Falling object protection on plant working under walls or backsWord (.docx)A four-page field form for one critical control: its bowtie, objective, performance requirements and failure modes, the checklist (Pass, Fail, and Non-conformance on administrative items only), the overall result, actions, talk to the people, and sign-off.
CCV-09 Emergency response and refuge for people trapped by a fall of groundWord (.docx)A four-page field form for one critical control: its bowtie, objective, performance requirements and failure modes, the checklist (Pass, Fail, and Non-conformance on administrative items only), the overall result, actions, talk to the people, and sign-off.
CCV-10 Catch berms, windrows and rockfall barriers kept effectiveWord (.docx)A four-page field form for one critical control: its bowtie, objective, performance requirements and failure modes, the checklist (Pass, Fail, and Non-conformance on administrative items only), the overall result, actions, talk to the people, and sign-off.
CCV ScheduleWord (.docx)Who verifies each control, how often by exposure, the method and the record: in Word, and as an Excel workbook with suggested frequencies, next due dates and status by formula.
CCV ScheduleExcel (.xlsx)Who verifies each control, how often by exposure, the method and the record: in Word, and as an Excel workbook with suggested frequencies, next due dates and status by formula.

The technical content paraphrases, and cites by title, the mining work health and safety laws and regulations for your state or territory, the mines regulator's guidance on ground control in underground and open cut mines and quarries, the model Code of Practice How to manage work health and safety risks, and your geotechnical engineer's design and advice for the site. Nothing is copied.

Questions about this pack

What is a critical control verification (CCV)?

A planned check, in the field, that one critical control is doing its job: that it exists, is in place and in good condition, functions as designed, is used properly and is not bypassed or failing silently. It is proof, not assumption. It is not a general inspection or audit: it tests one control, in depth, against what it must achieve. A CCV form, or CCV checklist, is the record of that check.

Which critical controls are in the Ground Failure and Rockfall pack?

10 critical controls (6 preventing, 1 preventing and mitigating, 3 mitigating) for the unwanted event: uncontrolled fall of ground or rock onto or near people or equipment. CCV-01 Ground support installed to the standard before people work under it; CCV-02 Ground support tested to the testing programme and failures acted on; CCV-03 Excavation kept within the geotechnical design; CCV-04 Loose rock scaled down before people or plant work under it; CCV-05 Barricading and exclusion from unsupported or unstable ground; CCV-06 Ground monitoring with trigger action response plans acted on; CCV-07 Ground inspected after firing, rain or a seismic event before re-entry; CCV-08 Falling object protection on plant working under walls or backs; CCV-09 Emergency response and refuge for people trapped by a fall of ground; CCV-10 Catch berms, windrows and rockfall barriers kept effective. CCV-06 works on both sides of the bowtie: it makes the event less likely and limits the harm if it happens, so the checklist tests both roles.

What is a bowtie, and is it included?

A bowtie is a one-page diagram of a risk: the threats that could cause the unwanted event on the left, the consequences on the right, and the critical controls on each line. The Ground Failure and Rockfall Bowtie is included in Word and PDF, so you can use it as an editable bowtie template for your site, and each CCV form shows where its control sits on it.

How is a CCV scored?

Pass or Fail on every item. Non-conformance is offered only on administrative items: records, training currency, plan and review dates, things that would not on their own cause the unwanted event straight away. Every other item checks that the control is physically there and working, so it is Pass or Fail only: its NC box is greyed out. Any Fail means the control is not effective: the work that relies on it stops, and it is escalated as a high potential incident. A Non-conformance gets a temporary control if needed and an action closed within 30 days; a repeat is investigated.

What is on the last page of each form?

Talk to the people: five or six prompts written for that control, for the operators, workers and supervisors who use it: what they actually do, when it gets skipped or is hard to use, what has changed, and what they would fix. Anything that suggests the control is missing, bypassed or not working is checked in the field straight away and scored; confirmed, it is a Fail. Everything else that matters goes in the comments, and each thing to fix becomes an action with an owner and a due date.

How often should critical controls be verified?

The CCV schedule (verification schedule) sets how often each critical control is verified, by the exposure where it is used: high (daily exposure, many people or vehicles), medium (weekly, or few people) or low (an occasional task). The guide gives weekly, monthly and quarterly as starting points; each control's own frequencies are set in the schedule. Verify a control in every place it is used, in turn, and more often after a Fail, a near miss or a change, and while an action is open.

Is this pack suitable for my state?

Yes, anywhere in Australia, and outside Australia too. Written to work in any country, with Australian law as the worked example: the documents say to check the law, the regulator and the guidance where you work, and in Australia they work in every state and territory, Victoria included. The model Code of Practice How to manage work health and safety risks and other Australian guidance are cited by title as the example. Some requirements, such as licences, notifying the regulator and registering plant, differ between countries and jurisdictions: check with your regulator. In Australia, your state or territory may have approved the codes with changes, and Victoria has its own Occupational Health and Safety Act and regulations, and WorkSafe Victoria publishes its own guidance. In Australia, mining has its own work health and safety laws: each state and territory has laws or regulations for mines and quarries, and your site's principal hazard management plans and trigger action response plans come first. The pack gives no design values: every limit is a placeholder for your site's own design criteria and standards.

Can we change the forms?

Yes. Every form, the bowtie and the schedule are editable Word and Excel files: add your logo and business name, your site's limits, plant and roles, delete items that do not apply and add your own. The guide says what to adapt, and how to decide whether a new item may offer Non-conformance.

Is it legal advice, or the same as an audit?

No. These forms help your business prove that its critical controls are in place and working. They do not do that on their own: adapt them to your site, plant and people, verify in the field, and act on what you find. The forms are general information, not legal advice. Work health and safety law differs between jurisdictions and changes over time. Check the requirements that apply where you operate.

Is GST included in the price?

Yes, for buyers in Australia: every price in the store includes GST, so $149.00 is the total, including $13.55 GST, and your receipt is a tax invoice showing the GST. Buyers outside Australia don't pay GST: you pay $135.45, the price without the GST, and your receipt shows no GST.

How are the files delivered?

As a ZIP download. Card purchases can be downloaded straight away from the confirmation page and by a link we email you. Download links expire after 14 days for security; you can request a new one at any time.

Can we use it at more than one site?

Yes, across your own organisation. The pack is licensed for internal use by the purchasing organisation. A consultant using it with clients needs separate written permission.

What is your refund policy?

Your rights under the Australian Consumer Law are not affected. See the Refund Policy for how we handle a product that is faulty, not as described, or not what you ordered.

Legal information here is general. It may not be correct in your jurisdiction: please check with your local WHS or OHS regulator.

Ordering for a business or several sites? Request an invoice. Other questions: contact us.

Goes with

The plan that sets up the critical risk program these forms verify. The Critical Control Management training packages.

Critical Risk Management Plan

For: Australian businesses with work that could kill or seriously injure someone, and the officers, managers, supervisors and WHS advisers who manage those risks

A complete, editable critical risk management plan for Australian businesses: find the risks that could kill, map them with bowties, define, own and verify the critical controls, aligned to the model WHS laws and ISO 31000.

What's included
  • The critical risk management plan, a policy, and a roles and accountabilities guide with officers' due diligence
  • A broad-brush workshop guide, an Excel critical risk register that tiers and ranks each risk on the same risk matrix as the WHS plans, and a drawn bowtie template
  • A critical control selection checklist, performance standard template, control owner accountability statement and Excel critical controls register
  • An Excel verification program and schedule, a generic verification form scored Pass, Fail or Non-conformance, an officers' report, a failure response procedure and a dashboard
$349incl. GST$317.27AUD, GST-free outside Australia
Add to CartRequest Invoice

Training: Critical Control Management Practitioner · Critical Control Management Implementation Toolkit