| How to Use These CCVs | Word (.docx) | The guide: what a CCV is, how to verify and score, the response to a Fail or Non-conformance, frequency, and how to adapt the pack to your site. |
| Hazardous Energy Isolation Bowtie | Word (.docx) | Every threat, consequence and critical control on one landscape page, with its key: which controls prevent, which mitigate, which work on both sides, and the supporting controls. |
| CCV-01 Every energy source identified and isolated at its isolation point | Word (.docx) | A four-page field form for one critical control: its bowtie, objective, performance requirements and failure modes, the checklist (Pass, Fail, and Non-conformance on administrative items only), the overall result, actions, talk to the people, and sign-off. |
| CCV-02 Personal lock and tag on every isolation point, by every person working | Word (.docx) | A four-page field form for one critical control: its bowtie, objective, performance requirements and failure modes, the checklist (Pass, Fail, and Non-conformance on administrative items only), the overall result, actions, talk to the people, and sign-off. |
| CCV-03 Stored and residual energy released or restrained | Word (.docx) | A four-page field form for one critical control: its bowtie, objective, performance requirements and failure modes, the checklist (Pass, Fail, and Non-conformance on administrative items only), the overall result, actions, talk to the people, and sign-off. |
| CCV-04 Zero energy proved before work starts | Word (.docx) | A four-page field form for one critical control: its bowtie, objective, performance requirements and failure modes, the checklist (Pass, Fail, and Non-conformance on administrative items only), the overall result, actions, talk to the people, and sign-off. |
| CCV-05 Controlled removal of isolation and return to service | Word (.docx) | A four-page field form for one critical control: its bowtie, objective, performance requirements and failure modes, the checklist (Pass, Fail, and Non-conformance on administrative items only), the overall result, actions, talk to the people, and sign-off. |
| CCV-06 No work on running or live plant without an approved safe method | Word (.docx) | A four-page field form for one critical control: its bowtie, objective, performance requirements and failure modes, the checklist (Pass, Fail, and Non-conformance on administrative items only), the overall result, actions, talk to the people, and sign-off. |
| CCV-07 Emergency response for crush, entrapment and electric shock | Word (.docx) | A four-page field form for one critical control: its bowtie, objective, performance requirements and failure modes, the checklist (Pass, Fail, and Non-conformance on administrative items only), the overall result, actions, talk to the people, and sign-off. |
| CCV Schedule | Word (.docx) | Who verifies each control, how often by exposure, the method and the record: in Word, and as an Excel workbook with suggested frequencies, next due dates and status by formula. |
| CCV Schedule | Excel (.xlsx) | Who verifies each control, how often by exposure, the method and the record: in Word, and as an Excel workbook with suggested frequencies, next due dates and status by formula. |