Workplace health, safety, risk and emergency training · In person and online1800 231 173
Orana Skills Centre
Home / Documents & Templates / CCV packs / Stored Energy and Pressure
Documents & Templates

Stored Energy and Pressure Critical Control Verification Pack

Critical control verification (CCV) checklists for stored energy and pressure: one four-page CCV form for each of the 6 critical controls that stop the unwanted event, sudden release of stored energy or pressure, or limit the harm when it happens, with the bowtie, a verification schedule and a guide.

  • HazardTyres, compressed air, hydraulics and pressure vessels
  • Unwanted eventSudden release of stored energy or pressure
  • Critical controls6: 4 preventing, 2 mitigating
  • FormsOne four-page CCV form per control, the bowtie, a CCV schedule and a guide
  • Task or hazardTyre changing and inflation; Managing critical risks
  • JurisdictionNational: check licences and notifications with your regulator
  • FormatsWord and Excel, editable, with PDF copies
  • CodeDOC-SEP-CCV
  • Version1.0 · 3.7 MB ZIP

What is this pack?

The Stored Energy and Pressure Critical Control Verification Pack is a set of editable critical control verification (CCV) checklists for stored energy, tyre and pressure risks in Australian workplaces, for WHS advisers, managers, supervisors and control owners. It covers 6 critical controls (4 preventing, 2 mitigating) for the unwanted event: sudden release of stored energy or pressure. It includes 6 four-page CCV forms in Word and PDF, one for each critical control; the Stored Energy and Pressure Bowtie on one page; the CCV schedule in Word, PDF and Excel; and the guide How to Use These CCVs. It draws on the model Code of Practice Managing the risks of plant in the workplace, cited by title. It supports verification; it is not legal advice.

The 6 critical controls

  1. CCV-01 Tyres inflated in a safety cage or by remote inflation, with nobody in the trajectory (mitigating)
  2. CCV-02 Tyre deflated, and rim checked, before demounting or rim work (preventing)
  3. CCV-03 Hydraulic pressure released and raised parts mechanically supported before work (preventing)
  4. CCV-04 Hoses and fittings rated, inspected and restrained (preventing)
  5. CCV-05 Air receivers and pressure vessels protected and inspected (preventing)
  6. CCV-06 Emergency response for blast, crush and injection injuries (mitigating)

About this pack

Most workplaces have controls for stored energy and pressure: tyre cages, remote inflation, valve core removal, props and stands, whip checks and relief valves. The question is whether they are working today. A critical control verification (CCV) is the proof: a planned check, in the field, that a control that matters most is in place, in good condition, working as designed, used properly and not bypassed.

This pack gives you one CCV form for each of 6 critical controls (4 preventing, 2 mitigating). Each form shows where the control sits on the bowtie, what it must achieve, how it fails, and a checklist grouped by those five checks and then the records. The last page has prompts for talking to the people who use the control.

Every item is Pass or Fail; Non-conformance is kept for administrative items such as records and training dates, and its box is greyed out on the rest. A Fail stops the work that relies on the control and is escalated as a high potential incident. The download holds 6 four-page CCV forms in Word and PDF, one for each critical control; the Stored Energy and Pressure Bowtie on one page; the CCV schedule in Word, PDF and Excel; and the guide How to Use These CCVs.

Where it applies: Tyre and rim work on vehicles and mobile plant, compressed air systems and hoses, hydraulic systems and raised components, air receivers, pressure vessels and gas cylinders, in workshops, depots and in the field.

What it helps you do

  • Prove, not assume, that the 6 critical controls for stored energy and pressure are in place and working
  • Score each control the same way every time: Pass, Fail, or Non-conformance for administrative items only
  • Act at once on a Fail, and close every Non-conformance with an owner and a date
  • Hear from the people who use each control where it is skipped or hard to use
  • Report CCV results as a leading indicator, alongside incident data

Each checklist is grouped by

  • It exists: it is there, at this place, for this work, today
  • It is in place and in good condition
  • It functions as designed
  • It is being used properly
  • It is not being bypassed or failing silently
  • Records and administration

The critical controls

Each has its own four-page CCV form. Preventing controls sit on the threat lines of the bowtie and stop the unwanted event; mitigating controls sit on the consequence lines and limit the harm. A control on both sides is one control, verified for both roles.

CCVCritical controlTypeSits onChecklist items
CCV-01Tyres inflated in a safety cage or by remote inflation, with nobody in the trajectory
If a tyre or rim fails during inflation, contain the blast and keep people out of its path: inflate in a tyre cage rated for the tyre, or by remote inflation with a clip-on chuck and in-line gauge, standing outside the trajectory.
MitigatingC1, C29 (2 administrative)
CCV-02Tyre deflated, and rim checked, before demounting or rim work
Before any wheel nut, rim clamp or lock ring is loosened, deflate the tyre completely by removing the valve core, confirm it is at zero, and check the rim parts for damage, mismatch and corrosion before refitting.
PreventingT1, T59 (2 administrative)
CCV-03Hydraulic pressure released and raised parts mechanically supported before work
Before anyone works under or on a raised body, boom, blade, bucket or attachment, or opens a hydraulic line, lower it or support it with a rated prop, stand or locking pin, and release the hydraulic pressure, including in accumulators.
PreventingT2, T59 (2 administrative)
CCV-04Hoses and fittings rated, inspected and restrained
Make sure hydraulic and compressed air hoses and fittings are rated for the pressure, in good condition, replaced before they fail, and restrained with whip checks or safety clips so a failed hose cannot whip.
PreventingT2, T39 (2 administrative)
CCV-05Air receivers and pressure vessels protected and inspected
Keep air receivers, pressure vessels and gas cylinders within their design pressure: safety relief valves set and working, pressure gauges readable, regular drainage and inspection, and registration where the law requires it.
PreventingT49 (2 administrative)
CCV-06Emergency response for blast, crush and injection injuries
If someone is hurt by a release, give first aid, control bleeding and get them to hospital fast, and treat any fluid injection or air entering the body as a surgical emergency, even when the wound looks small.
MitigatingC2, C39 (2 administrative)

Threats

  • T1 Tyre or multi-piece rim fails during inflation, removal or fitting
  • T2 Hydraulic hose or fitting bursts, or a raised part drops when pressure is lost
  • T3 Compressed air hose whips, or air enters the body
  • T4 Air receiver, pressure vessel or gas cylinder fails or is overpressurised
  • T5 Pressure not released before a part is loosened, removed or opened

Consequences

  • C1 Worker killed by a blast, projectile or falling part
  • C2 Serious injury: fractures, head and eye injuries, amputation
  • C3 Fluid injection or air embolism injury

Supporting controls, shown dashed on the bowtie with no CCV form: Face shield and safety glasses (on C2).

How each form is scored

The same rules in every pack. The worst item decides the overall result.

MarkWhen
PassYou saw it in place and working, today. A Pass is something you saw, not something you remembered or were told.
FailIt is not in place, or it does not work, or it is bypassed. On an administrative item, use Fail only when what you found means the control itself is not there (for example, nobody on the shift is authorised to operate).
Non-conformance (NC)Administrative items only. The control is in place and working, but a supporting element is missing, late or incomplete: a record, a training date, a review date. Fix it as an action.

Non-conformance is offered only on administrative items: records, training currency, plan and review dates, things that would not on their own cause the unwanted event straight away. Every other item checks that the control is physically there and working, so it is Pass or Fail only: its NC box is greyed out.

Overall resultWhenWhat happens
PASSEvery item PassIn place and effective. Record it in the CCV schedule, and check it against hazard reports, near misses and incidents for this control.
NON-CONFORMANCENo Fail; one or more NCIn place, not fully effective. A temporary control first if needed; an action for each NC, with an owner, closed within 30 days. Tell the supervisor and control owner this shift. A repeat NC is investigated.
FAILAny item FailNOT effective. Stop the work that relies on it, make it safe, and tell the supervisor and the escalation contact now. Report it as a high potential incident. Restart only when the control, or a temporary control the risk owner accepts, is in place and verified again.

Talk to the people

The fourth page of every form: five or six prompts written for that control. Talk to at least two people who use, maintain or supervise this control, on the job and in their own words. Ask open questions and listen: they know where it gets skipped, worked around or is hard to use.

  • Anything that suggests the control is missing, bypassed or not working is checked in the field straight away and scored; confirmed, it is a Fail.
  • Everything else that matters goes in the comments, and each thing to fix becomes an action with an owner and a due date.
  • The people spoken to are told what will happen with what they said, and it is never used against them.

What is included

Delivered as one ZIP download. The files below are editable, and the Word documents also come as PDFs. Each download also includes Read Me First, a Product Overview, the Permitted Use Terms and Version Information (PDF).

FileFormatWhat it is for
How to Use These CCVsWord (.docx)The guide: what a CCV is, how to verify and score, the response to a Fail or Non-conformance, frequency, and how to adapt the pack to your site.
Stored Energy and Pressure BowtieWord (.docx)Every threat, consequence and critical control on one landscape page, with its key: which controls prevent, which mitigate, which work on both sides, and the supporting controls.
CCV-01 Tyres inflated in a safety cage or by remote inflation, with nobody in the trajectoryWord (.docx)A four-page field form for one critical control: its bowtie, objective, performance requirements and failure modes, the checklist (Pass, Fail, and Non-conformance on administrative items only), the overall result, actions, talk to the people, and sign-off.
CCV-02 Tyre deflated, and rim checked, before demounting or rim workWord (.docx)A four-page field form for one critical control: its bowtie, objective, performance requirements and failure modes, the checklist (Pass, Fail, and Non-conformance on administrative items only), the overall result, actions, talk to the people, and sign-off.
CCV-03 Hydraulic pressure released and raised parts mechanically supported before workWord (.docx)A four-page field form for one critical control: its bowtie, objective, performance requirements and failure modes, the checklist (Pass, Fail, and Non-conformance on administrative items only), the overall result, actions, talk to the people, and sign-off.
CCV-04 Hoses and fittings rated, inspected and restrainedWord (.docx)A four-page field form for one critical control: its bowtie, objective, performance requirements and failure modes, the checklist (Pass, Fail, and Non-conformance on administrative items only), the overall result, actions, talk to the people, and sign-off.
CCV-05 Air receivers and pressure vessels protected and inspectedWord (.docx)A four-page field form for one critical control: its bowtie, objective, performance requirements and failure modes, the checklist (Pass, Fail, and Non-conformance on administrative items only), the overall result, actions, talk to the people, and sign-off.
CCV-06 Emergency response for blast, crush and injection injuriesWord (.docx)A four-page field form for one critical control: its bowtie, objective, performance requirements and failure modes, the checklist (Pass, Fail, and Non-conformance on administrative items only), the overall result, actions, talk to the people, and sign-off.
CCV ScheduleWord (.docx)Who verifies each control, how often by exposure, the method and the record: in Word, and as an Excel workbook with suggested frequencies, next due dates and status by formula.
CCV ScheduleExcel (.xlsx)Who verifies each control, how often by exposure, the method and the record: in Word, and as an Excel workbook with suggested frequencies, next due dates and status by formula.

The technical content paraphrases, and cites by title, Safe Work Australia's model Codes of Practice Managing the risks of plant in the workplace and How to manage work health and safety risks, your regulator's guidance on tyre and rim work, and the Australian Standards for pressure equipment, air receivers and tyre inflation cages your business uses. Plant registration and inspection rules for pressure equipment differ between jurisdictions: check with your regulator. Nothing is copied.

Questions about this pack

What is a critical control verification (CCV)?

A planned check, in the field, that one critical control is doing its job: that it exists, is in place and in good condition, functions as designed, is used properly and is not bypassed or failing silently. It is proof, not assumption. It is not a general inspection or audit: it tests one control, in depth, against what it must achieve. A CCV form, or CCV checklist, is the record of that check.

Which critical controls are in the Stored Energy and Pressure pack?

6 critical controls (4 preventing, 2 mitigating) for the unwanted event: sudden release of stored energy or pressure. CCV-01 Tyres inflated in a safety cage or by remote inflation, with nobody in the trajectory; CCV-02 Tyre deflated, and rim checked, before demounting or rim work; CCV-03 Hydraulic pressure released and raised parts mechanically supported before work; CCV-04 Hoses and fittings rated, inspected and restrained; CCV-05 Air receivers and pressure vessels protected and inspected; CCV-06 Emergency response for blast, crush and injection injuries.

What is a bowtie, and is it included?

A bowtie is a one-page diagram of a risk: the threats that could cause the unwanted event on the left, the consequences on the right, and the critical controls on each line. The Stored Energy and Pressure Bowtie is included in Word and PDF, so you can use it as an editable bowtie template for your site, and each CCV form shows where its control sits on it.

How is a CCV scored?

Pass or Fail on every item. Non-conformance is offered only on administrative items: records, training currency, plan and review dates, things that would not on their own cause the unwanted event straight away. Every other item checks that the control is physically there and working, so it is Pass or Fail only: its NC box is greyed out. Any Fail means the control is not effective: the work that relies on it stops, and it is escalated as a high potential incident. A Non-conformance gets a temporary control if needed and an action closed within 30 days; a repeat is investigated.

What is on the last page of each form?

Talk to the people: five or six prompts written for that control, for the operators, workers and supervisors who use it: what they actually do, when it gets skipped or is hard to use, what has changed, and what they would fix. Anything that suggests the control is missing, bypassed or not working is checked in the field straight away and scored; confirmed, it is a Fail. Everything else that matters goes in the comments, and each thing to fix becomes an action with an owner and a due date.

How often should critical controls be verified?

The CCV schedule (verification schedule) sets how often each critical control is verified, by the exposure where it is used: high (daily exposure, many people or vehicles), medium (weekly, or few people) or low (an occasional task). The guide gives weekly, monthly and quarterly as starting points; each control's own frequencies are set in the schedule. Verify a control in every place it is used, in turn, and more often after a Fail, a near miss or a change, and while an action is open.

Is this pack suitable for my state?

Yes, anywhere in Australia. It is national, written for the WHS and OHS laws generally, with the model Code of Practice Managing the risks of plant in the workplace and other guidance cited by title. Your state or territory may have approved the codes with changes, and some requirements, such as licences, notifying the regulator and registering plant, differ between jurisdictions: check with your regulator. Victoria has its own Occupational Health and Safety Act 2004 and regulations, and WorkSafe Victoria publishes its own guidance.

Can we change the forms?

Yes. Every form, the bowtie and the schedule are editable Word and Excel files: add your logo and business name, your site's limits, plant and roles, delete items that do not apply and add your own. The guide says what to adapt, and how to decide whether a new item may offer Non-conformance.

Is it legal advice, or the same as an audit?

No. These forms help your business prove that its critical controls are in place and working. They do not do that on their own: adapt them to your site, plant and people, verify in the field, and act on what you find. The forms are general information, not legal advice. Work health and safety law differs between jurisdictions and changes over time. Check the requirements that apply where you operate.

Is GST included in the price?

Yes. Every price in the store includes GST, so $149.00 is the total, including $13.55 GST. Your receipt is a tax invoice showing the GST.

How are the files delivered?

As a ZIP download. Card purchases can be downloaded straight away from the confirmation page and by a link we email you. Download links expire after 14 days for security; you can request a new one at any time.

Can we use it at more than one site?

Yes, across your own organisation. The pack is licensed for internal use by the purchasing organisation. A consultant using it with clients needs separate written permission.

What is your refund policy?

Your rights under the Australian Consumer Law are not affected. See the Refund Policy for how we handle a product that is faulty, not as described, or not what you ordered.

Legal information here is general. It may not be correct in your jurisdiction: please check with your local WHS or OHS regulator.

Ordering for a business or several sites? Request an invoice. Other questions: contact us.

Goes with

The documents that set and check the controls for the same work. The audit tools for the code of practice. The plan that sets up the critical risk program these forms verify. The Critical Control Management training packages.

Tyre Changing and Inflation Safety & Competency Pack

For: Employers whose workers use tyre changing and inflation equipment

Safe work instruction, VOC assessment, pre-use checklist and a supervisor field verification checklist, written to work together.

What's included
  • Tyre Changing and Inflation safe work instruction
  • Tyre Changing and Inflation VOC assessment, with an Excel VOC register
  • Pre-use checklist and supervisor field verification checklist
  • Setup guide: what to adapt for your site

Compressed Air and Pressure Washer Safety & Competency Pack

For: Employers whose workers use compressed air equipment or a pressure washer

Safe work instruction, VOC assessment, pre-use checklist and a supervisor field verification checklist, written to work together.

What's included
  • Compressed Air and Pressure Washers safe work instruction
  • Compressed Air and Pressure Washers VOC assessment, with an Excel VOC register
  • Pre-use checklist and supervisor field verification checklist
  • Setup guide: what to adapt for your site

Plant in the Workplace Code of Practice Audit Tool

For: WHS advisers, managers, supervisors and health and safety representatives

An Excel audit tool for the code of practice Managing risks of plant in the workplace, with 25 referenced questions, automatic scores, a dashboard, corrective actions, a field checklist and a report template.

What's included
  • 25 referenced audit questions in 6 chapters
  • Excel workbook with automatic scoring, a dashboard and corrective actions
  • Field audit checklist and audit report template (Word and PDF)
  • Guide: how to rate, evidence and follow up

Critical Risk Management Plan

For: Australian businesses with work that could kill or seriously injure someone, and the officers, managers, supervisors and WHS advisers who manage those risks

A complete, editable critical risk management plan for Australian businesses: find the risks that could kill, map them with bowties, define, own and verify the critical controls, aligned to the model WHS laws and ISO 31000.

What's included
  • The critical risk management plan, a policy, and a roles and accountabilities guide with officers' due diligence
  • A broad-brush workshop guide, an Excel critical risk register that tiers and ranks each risk on the same risk matrix as the WHS plans, and a drawn bowtie template
  • A critical control selection checklist, performance standard template, control owner accountability statement and Excel critical controls register
  • An Excel verification program and schedule, a generic verification form scored Pass, Fail or Non-conformance, an officers' report, a failure response procedure and a dashboard

Training: Critical Control Management Practitioner · Critical Control Management Implementation Toolkit