| How to Use These CCVs | Word (.docx) | The guide: what a CCV is, how to verify and score, the response to a Fail or Non-conformance, frequency, and how to adapt the pack to your site. |
| Stored Energy and Pressure Bowtie | Word (.docx) | Every threat, consequence and critical control on one landscape page, with its key: which controls prevent, which mitigate, which work on both sides, and the supporting controls. |
| CCV-01 Tyres inflated in a safety cage or by remote inflation, with nobody in the trajectory | Word (.docx) | A four-page field form for one critical control: its bowtie, objective, performance requirements and failure modes, the checklist (Pass, Fail, and Non-conformance on administrative items only), the overall result, actions, talk to the people, and sign-off. |
| CCV-02 Tyre deflated, and rim checked, before demounting or rim work | Word (.docx) | A four-page field form for one critical control: its bowtie, objective, performance requirements and failure modes, the checklist (Pass, Fail, and Non-conformance on administrative items only), the overall result, actions, talk to the people, and sign-off. |
| CCV-03 Hydraulic pressure released and raised parts mechanically supported before work | Word (.docx) | A four-page field form for one critical control: its bowtie, objective, performance requirements and failure modes, the checklist (Pass, Fail, and Non-conformance on administrative items only), the overall result, actions, talk to the people, and sign-off. |
| CCV-04 Hoses and fittings rated, inspected and restrained | Word (.docx) | A four-page field form for one critical control: its bowtie, objective, performance requirements and failure modes, the checklist (Pass, Fail, and Non-conformance on administrative items only), the overall result, actions, talk to the people, and sign-off. |
| CCV-05 Air receivers and pressure vessels protected and inspected | Word (.docx) | A four-page field form for one critical control: its bowtie, objective, performance requirements and failure modes, the checklist (Pass, Fail, and Non-conformance on administrative items only), the overall result, actions, talk to the people, and sign-off. |
| CCV-06 Emergency response for blast, crush and injection injuries | Word (.docx) | A four-page field form for one critical control: its bowtie, objective, performance requirements and failure modes, the checklist (Pass, Fail, and Non-conformance on administrative items only), the overall result, actions, talk to the people, and sign-off. |
| CCV Schedule | Word (.docx) | Who verifies each control, how often by exposure, the method and the record: in Word, and as an Excel workbook with suggested frequencies, next due dates and status by formula. |
| CCV Schedule | Excel (.xlsx) | Who verifies each control, how often by exposure, the method and the record: in Word, and as an Excel workbook with suggested frequencies, next due dates and status by formula. |