| How to Use These CCVs | Word (.docx) | The guide: what a CCV is, how to verify and score, the response to a Fail or Non-conformance, frequency, and how to adapt the pack to your site. |
| Structural Collapse and Demolition Bowtie | Word (.docx) | Every threat, consequence and critical control on one landscape page, with its key: which controls prevent, which mitigate, which work on both sides, and the supporting controls. |
| CCV-01 Demolition done in the engineer's sequence, with hold points checked | Word (.docx) | A four-page field form for one critical control: its bowtie, objective, performance requirements and failure modes, the checklist (Pass, Fail, and Non-conformance on administrative items only), the overall result, actions, talk to the people, and sign-off. |
| CCV-02 Temporary works designed, installed and inspected before loading, removed only with approval | Word (.docx) | A four-page field form for one critical control: its bowtie, objective, performance requirements and failure modes, the checklist (Pass, Fail, and Non-conformance on administrative items only), the overall result, actions, talk to the people, and sign-off. |
| CCV-03 Floor and platform load limits kept | Word (.docx) | A four-page field form for one critical control: its bowtie, objective, performance requirements and failure modes, the checklist (Pass, Fail, and Non-conformance on administrative items only), the overall result, actions, talk to the people, and sign-off. |
| CCV-04 Elements of unknown or weakened condition propped or isolated before work | Word (.docx) | A four-page field form for one critical control: its bowtie, objective, performance requirements and failure modes, the checklist (Pass, Fail, and Non-conformance on administrative items only), the overall result, actions, talk to the people, and sign-off. |
| CCV-05 Exclusion zone around the collapse and drop zone kept clear | Word (.docx) | A four-page field form for one critical control: its bowtie, objective, performance requirements and failure modes, the checklist (Pass, Fail, and Non-conformance on administrative items only), the overall result, actions, talk to the people, and sign-off. |
| CCV-06 Emergency response for collapse and entrapment | Word (.docx) | A four-page field form for one critical control: its bowtie, objective, performance requirements and failure modes, the checklist (Pass, Fail, and Non-conformance on administrative items only), the overall result, actions, talk to the people, and sign-off. |
| CCV Schedule | Word (.docx) | Who verifies each control, how often by exposure, the method and the record: in Word, and as an Excel workbook with suggested frequencies, next due dates and status by formula. |
| CCV Schedule | Excel (.xlsx) | Who verifies each control, how often by exposure, the method and the record: in Word, and as an Excel workbook with suggested frequencies, next due dates and status by formula. |