Documents & Templates

Project Management Plan

A complete, editable project management plan for Australian businesses: risk-based, with every project tiered by its risk at the start, and the plan, policy and tools to initiate, plan, approve, deliver, close and evaluate it, through three gates.

  • JurisdictionAustralia-wide
  • RegulatorThe WHS or OHS regulator where you operate
  • Task or hazardManaging projects
  • DocumentsManagement plan
  • FormatsWord (.docx), Excel (.xlsx), editable
  • CodeDOC-PRJ-PLAN
  • Version1.0 · 2.7 MB ZIP

About the Project Management Plan

The Project Management Plan is a complete, editable project management plan for Australian businesses, for australian businesses that run projects of any kind, and the sponsors, project managers and WHS advisers who plan, deliver and oversee them. It is aligned to the model WHS laws, with notes on how Victoria, Western Australia and the Commonwealth (Comcare) differ, and to ISO 21502 for project management, ISO 31000, AS/NZS ISO 45001, ISO 9001 and ISO 14001, with a cross-reference to each. It includes the project management plan, a policy, and a roles and governance guide with governance by tier; an Excel project risk tiering tool on the same risk matrix as the WHS plans, with what each tier requires; a project brief and business case, project execution plan, Excel risk register with risk-based contingency, safety in design review and project WHS plan; and a gate records, status report with earned value, health check, field verification, handover, closure, post-implementation review and a portfolio dashboard. Everything is editable Word or Excel, delivered as an instant download.

The decisions leaders make about a project, from whether it goes ahead to who delivers it and how closely it is overseen, shape its risks and its outcomes. Projects bring new work, new people and new interfaces in a short time, and they carry more than safety risk: the schedule, the cost, the service, your reputation, the environment and your information. Under the WHS laws, designers must design out risks so far as is reasonably practicable, a construction project needs a principal contractor with a written WHS management plan before work starts, and every business on the project must consult, cooperate and coordinate with the others.

This plan manages projects of every kind as a whole-of-business risk: capital and construction works, fit-outs and refurbishments, plant and equipment upgrades, events, IT and digital projects, process improvement, and shutdowns and outages. Each project is rated once, at initiation, for its inherent risk across six areas (health and safety, operations and delivery including the schedule, financial including cost, reputation, environment, and information and security) on the same risk matrix as the WHS risk register. Its tier, from Tier 1 to Tier 4, sets the governance, planning depth, gates, assurance and evaluation through six stages: initiate, plan, approve, deliver, close and evaluate. Tier 1 and 2 projects have a project board, earned value and independent health checks; small, low-risk projects have a light path on one form.

It is aligned to the model WHS laws, with notes on how Victoria, Western Australia and the Commonwealth (Comcare) differ, and to ISO 21502 for project management, ISO 31000, AS/NZS ISO 45001, ISO 9001 and ISO 14001, with a cross-reference to each. It is written once for the whole of Australia and leaves the detail of each jurisdiction to your WHS management system. It is not ISO certification. Everything is editable Word or Excel, with a setup guide and a 90-day implementation plan. It is a framework to adapt and put into practice with your workers, not a substitute for doing so.

Who it is for

  • Australian businesses that run projects: building works, fit-outs, upgrades, events, IT, improvements and shutdowns, in any state or territory
  • Project sponsors, project managers, and facilities, operations, IT and events managers who want one risk-based way to run projects
  • Site supervisors and project WHS leads who verify critical controls in the field
  • WHS and risk advisers, and officers who want to see how project risk is governed and controlled

What it helps you do

  • Tier every project at the start, and scale its governance, planning, gates and assurance to its risk
  • Design hazards out, plan the work safely, and set the critical controls before anything is built or bought
  • Approve projects at gates, at the right level, only when what the risk requires is ready
  • Verify critical controls in the field, control change within tolerances, and check the project's health
  • Close against the success criteria, review the benefits, and feed the lessons back into how you work

What is included in the Project Management Plan

Delivered as one ZIP download. The files below are editable, and every Word document also comes as a PDF. Each download also includes Read Me First, a Product Overview, the Permitted Use Terms and Version Information (PDF).

FileFormatWhat it is for
90-Day Implementation PlanWord (.docx)A week-by-week plan for the first 90 days: list and tier the projects under way, bring the Tier 1 and Tier 2 projects under control first, then assure, close and report.
Setup GuideWord (.docx)What to adapt before use, in order: the portfolio lead and executive approver, scope, consequence thresholds, the tier table and tolerances, approval authorities, and every placeholder.
Australian Law Cross-ReferenceWord (.docx)Maps the model WHS Act and Regulations provisions on designers, construction projects, principal contractors, SWMS, consultation and notifiable incidents to the pack, with how Victoria, Western Australia and Comcare differ.
ISO Standards Cross-ReferenceWord (.docx)Maps ISO 21502 (project management), ISO 31000, AS/NZS ISO 45001, ISO 9001 and ISO 14001 to where the pack covers each. Aligned to, not certification.
Project Management PlanWord (.docx)The plan itself: the seven kinds of project, the six stages and three gates, what each tier requires at each stage, governance, construction projects and principal contractors, and the light path for small projects.
Project Management PolicyWord (.docx)A short project management policy for the chief executive or owner to sign: the commitment, what is expected of everyone, and how the risk sets the level of control.
Roles and Governance GuideWord (.docx)Who has duties on a project, governance by tier, the roles from sponsor and project board to principal contractor and end users, who does what at each stage, approval authorities and officers' due diligence.
Gate 1 Approval RecordWord (.docx)Records the decision to plan the project, at the authority its tier sets, with what must be ready before deciding and the budget and time to plan.
Project Brief and Business CaseWord (.docx)Why the project is needed, the options, the benefits, measurable success criteria, the tier and who is accountable, with a one-form light path for Tier 4 projects.
Project Risk Tiering ToolExcel (.xlsx)An Excel tool that rates each project's inherent risk across six areas on the risk matrix and gives its tier, with the consequence scales and what each tier requires.
Stakeholder RegisterExcel (.xlsx)An Excel register of the project's stakeholders: their interest, influence and concerns, how each is engaged, and the workers and HSRs who must be consulted.
Communication PlanWord (.docx)Who needs to know what, when, how and from whom, the consultation with workers and HSRs on WHS, the reporting rhythm, and how complaints are handled.
Gate 2 Approval RecordWord (.docx)Records the decision to deliver the project, with the plan, the baseline, the contingency, safety in design, the WHS plan and the procurement ready first.
Procurement and Contracting PlanWord (.docx)The delivery model, the packages, who is the principal contractor, and what every contract in the project must require, by tier.
Project Execution PlanWord (.docx)The project's plan for delivery: scope and work breakdown, schedule, budget and contingency, resources, quality, environment, and change control with tolerances.
Project Risk RegisterExcel (.xlsx)An Excel register of the project's risks across all six areas, with inherent and residual ratings on the risk matrix, critical controls, and the costed risks that size the contingency.
Project WHS PlanWord (.docx)How the project's work will be done safely: the critical risk activities and their controls, site rules, coordination, incidents, and a check of the principal contractor's WHS management plan.
Safety in Design ReviewWord (.docx)Reviews the design through its whole life, from construction to demolition, with a constructability review and the designer's safety information passed on.
Field Verification ChecklistWord (.docx)Checks, where the work is done, that the critical controls for each critical risk activity are in place, used and working, and stops the work if not.
Interface and Coordination RegisterWord (.docx)Records each interface between the businesses on the project and the operations around it, who controls what, and how they coordinate.
Issues and Change LogExcel (.xlsx)An Excel log of issues and change requests, their effect on scope, schedule, cost and risk, whether they are within tolerance, and the decision.
Project Health CheckWord (.docx)Independent assurance, scaled by tier, that the project is on track and its controls are really working, with the actions for the sponsor or board.
Project Status ReportWord (.docx)The regular report on progress, cost, earned value, risks, issues, changes, WHS and critical control verification, with the decisions needed.
Handover and Commissioning ChecklistWord (.docx)Commissioning, testing and handover: the documents, the designer's safety information, training, defects and the end users' acceptance.
Lessons Learned RegisterExcel (.xlsx)An Excel register of lessons from every project, each with an action, an owner and where it changes the business's standards, tools or risk register.
Post-implementation ReviewWord (.docx)Reviews the benefits realised and the project's performance after handover, and records the lessons and where they are fed back.
Project Closure ReportWord (.docx)Gate 3: acceptance against the success criteria, performance against the baseline, residual risks handed on, financial close and demobilisation.
Project Portfolio DashboardExcel (.xlsx)An Excel dashboard of lead and lag indicators for projects, quarter by quarter, with the Tier 1 and 2 projects listed by name and their status.

How the plan works

The plan is the core; each folder is one stage of the project lifecycle. The tier set at initiation decides how much governance, planning and assurance each later stage needs, and what is learned in the post-implementation review feeds back into the next project.

FIRST

Start here

  • Setup guide: what to adapt, and every placeholder
  • 90-day implementation plan
  • Read Me First, Product Overview, Permitted Use Terms and Version Information
STEP 1

The plan

  • Project management plan, with what each tier requires at each stage
  • Project management policy to sign
  • Roles and governance guide
  • Australian law cross-reference
  • ISO standards cross-reference
STEP 2

Initiate

  • Project brief and business case, with the Tier 4 light path
  • Project risk tiering tool (Excel)
  • Stakeholder register (Excel)
  • Gate 1 approval record
STEP 3

Plan the project

  • Project execution plan
  • Project risk register with risk-based contingency (Excel)
  • Safety in design review
  • Project WHS plan
  • Procurement and contracting plan
  • Communication plan
  • Gate 2 approval record
STEP 4

Deliver

  • Project status report with earned value
  • Issues and change log (Excel)
  • Project health check
  • Field verification checklist
  • Interface and coordination register
STEP 5

Close and evaluate

  • Handover and commissioning checklist
  • Project closure report (Gate 3)
  • Post-implementation review
  • Lessons learned register (Excel)
  • Project portfolio dashboard (Excel)

Set it up for your organisation

Before you adopt it, adapt the plan to:

  • Your business: its name, sites, and the kinds of project the plan covers
  • Your consequence thresholds, especially the financial ones and what counts as a serious delay, and what each tier requires
  • The contingency defaults and the tolerances for cost, schedule and scope
  • Who runs the system, who approves each gate for each tier, and who sits on a project board
  • Your WHS adviser, and who acts as project WHS lead and design lead
  • Your risk register, and any contractor management, purchasing and change management procedures
  • Review the plan after a serious incident on a project, a significant change to the business or a change in the law, and at least once a year

What you need

  • Someone to run the system and keep the portfolio dashboard, and an executive to approve the highest-risk projects
  • A list of the projects planned or under way
  • A sponsor and a project manager for each project, and a project board for the Tier 1 and Tier 2 projects
  • Your risk register and consultation arrangements, and any contractor management and change management procedures, so projects work inside them
  • Time to verify critical controls in the field and to review each project after it closes: that is where the plan works or fails

Before you use it

  • The plan is licensed for internal use by the purchasing organisation. A WHS or HR adviser can set it up for a client that has bought it; using it with other clients needs our written permission.
  • The plan must be adapted to your organisation, your work and the hazards you find, in consultation with your workers, before it is adopted.
  • Using the plan does not by itself make a workplace compliant with WHS or OHS laws, it does not transfer any duty to a principal contractor or a designer, and it is not ISO certification. It supports the work of planning, delivering and evaluating projects on the basis of risk; it is not legal advice.

Project Management Plan: questions

Do I need a project management plan?

You need to manage the risks of the projects you run, and a written plan is the clearest way to show how you do it. Under the WHS laws, a business must manage the risks of the work it carries out, designers of plant and structures must design out risks so far as is reasonably practicable, every business with a duty for the same matter must consult, cooperate and coordinate with the others, and a construction project needs a principal contractor with a WHS management plan. Projects also carry schedule, cost, reputation, environment and information risks. The plan sets out how you manage them, who decides at each gate, and gives you the records that show it.

What should a project management plan include?

It should follow each project from start to finish: the need, the business case and measurable success criteria; a risk rating that sets how much governance and control it needs; the scope, schedule, budget and a contingency sized from the risks; a risk register; safety in design; procurement and contracting; WHS planning and the critical controls; communication and consultation; change control with tolerances; approval at gates; progress reporting; field verification and health checks; handover and acceptance; and a review of the benefits and lessons. This plan has a part for each, with the tools to do it.

What is a risk-based project management plan?

One that scales the effort to the risk. Each project is rated at the start for its inherent risk across six areas: health and safety, operations and delivery including the schedule, financial including cost, reputation, environment, and information and security, on the same risk matrix as your WHS risk register. The rating gives a tier. A Tier 1 project gets a project board, a full business case and plan, a contingency from the costed risks, earned value, independent health checks, field verification every shift and a review of the benefits at 3 and 12 months. A Tier 4 project gets one form, a spot check and a check that it was done.

When is a principal contractor WHS management plan required?

For a construction project. Under the model WHS Regulations, the business that commissions a construction project is its principal contractor, unless it engages and authorises another business to be, and the principal contractor must prepare a written WHS management plan for the workplace before work on the project starts. The plan sets out the people with health and safety responsibilities, the arrangements for consultation, cooperation and coordination between the businesses, for managing incidents, the site rules and how everyone is told of them, and how safe work method statements are collected and reviewed. The model Regulations define a construction project by the cost of the construction work; Western Australia defines it by the number of people working at the same time; Victoria has its own laws. The plan's construction part and its project WHS plan cover this.

Is it only about WHS?

No. Health and safety is one of six risk areas. The plan also covers operations and delivery, including the schedule, cost, reputation, the environment and information security, for every kind of project.

Is it only for construction?

No. It covers capital and construction works, fit-outs and refurbishments, plant and equipment upgrades, events, IT and digital projects, process improvement, and shutdowns and outages. Construction projects have a part of their own, for the principal contractor's duties and safe work method statements.

Which state is it for?

All of Australia. It is written to the model WHS laws, which most jurisdictions have adopted, with notes on how Victoria (with its own OHS laws), Western Australia and the Commonwealth (Comcare) differ, including what counts as a construction project. For the detail of your jurisdiction, it points to the WHS or OHS laws where you operate and to your own WHS management system.

Does this plan make us compliant?

No. No plan can do that on its own. Your duties are met by managing the risks of each project in your actual workplaces, so far as is reasonably practicable, in consultation with your workers and with the other businesses involved. The plan gives you the structure and the tools to do that, and a record that you have. Using the plan does not by itself make a workplace compliant with WHS or OHS laws, it does not transfer any duty to a principal contractor or a designer, and it is not ISO certification. It supports the work of planning, delivering and evaluating projects on the basis of risk; it is not legal advice.

Is it ISO certified?

No. The plan is aligned to ISO 21502 for project management, ISO 31000 for the risk method, AS/NZS ISO 45001 for hazard identification, safe design, change and procurement, and ISO 9001 and ISO 14001 where they apply, with a cross-reference to each. Certification is done by an independent certification body, against the standard itself.

How does it fit with the other plans?

It sits under your WHS management system. Our NSW WHS Management Plan sets out the minimum steps for a project's WHS risks, so it stands alone; this plan goes further, for businesses that run projects often or at higher risk. Our Contractor Management Plan and Change Management Plan go with it, for each contract and each change a project makes. The documents you adopt name no other product: where you have contractor or change procedures, the plan works with them, and where you do not, its own steps apply. See the WHS Management Plan.

Do we still need training?

Usually, yes. The plan only works when the people who run it know how. The Risk Management packages cover project workers, project managers and supervisors, practitioners and the officers and sponsors who approve projects, the Critical Control Management packages cover verifying critical controls in the field, and the toolbox talks brief the crew before a critical risk activity starts. See the Risk Management training packages.

Can a WHS adviser use it with clients?

The plan is licensed for internal use by the purchasing organisation. A WHS or HR adviser can set it up for a client that has bought it; using it with other clients needs our written permission. The simplest way is for each client to buy its own copy, which you then adapt with them.

Can we edit the documents?

Yes. Every document is supplied in Word (.docx) or Excel (.xlsx), so you can add your logo, change the wording and adapt it to your workplace. The copyright notice must stay.

Do we need to adapt it before use?

Yes. The plan must be adapted to your organisation, your work and the hazards you find, in consultation with your workers, before it is adopted. The setup guide lists what to change, and the 90-day implementation plan the order to do it in.

Is GST included in the price?

Yes. Every price in the store includes GST, so $349.00 is the total, including $31.73 GST. Your receipt is a tax invoice showing the GST.

How are the files delivered?

As a ZIP download. Card purchases can be downloaded straight away from the confirmation page and by a link we email you. Download links expire after 14 days for security; you can request a new one at any time.

Can we order by invoice, or for several sites?

Yes. Use Request an Invoice to order through your normal procurement process, with a purchase order number and quantities if you need them. The files are released once payment is confirmed.

Can we use them at more than one site?

Yes, across your own organisation. The documents are licensed for internal use by the purchasing organisation. A consultant, labour hire business or training provider supplying them to clients needs separate written permission.

What is your refund policy?

Your rights under the Australian Consumer Law are not affected. See the Refund Policy for how we handle a document that is faulty, not as described, or not what you ordered.

Licence and legal information here is general. It may not be correct in your jurisdiction: please check with your local WHS or OHS regulator.

Ordering for a business or several sites? Request an invoice. Other questions: contact us.

Training that goes with it

The plan sets up the system; training gives the people who run it what they need. The Risk Management packages cover project workers, project managers and supervisors, practitioners and the officers and sponsors who approve projects; the Critical Control Management packages cover verifying critical controls in the field; and the toolbox talks brief the crew before a critical risk activity starts.

Risk Management Awareness

For: All workersDuration: 45–60 minutes

A practical introduction for every worker: hazards and risk, the hierarchy of control, and checking the job before it starts.

What's included
  • Editable PowerPoint presentation
  • Facilitator guide and participant workbook
  • Hazard spotting and task risk assessment activities
  • Knowledge assessment and completion certificate

Risk Management Leadership

For: Supervisors, team leaders and managersDuration: 3–4 hours

For supervisors and managers who plan the work, lead the risk assessment and decide whether a job goes ahead.

What's included
  • Editable 44-slide presentation and detailed facilitator guide
  • Four supervisory scenarios from operational workplaces
  • Risk assessment review and workface control check tools
  • Completion certificate and training records

Risk Management Practitioner

For: Whoever is responsible for WHS in your businessDuration: One day

A full day on broad-brush and task risk assessment, the hierarchy of control, risk registers and management of change.

What's included
  • Editable 50-slide presentation and detailed facilitator manual
  • Full case pack and three worked risk assessment examples
  • Risk register workbook (Excel) and assessment worksheets
  • Assessments, completion certificate and training records

Executive Risk Governance

For: Business owners, directors and senior managersDuration: 90–120 minutes

For executives and directors: risk appetite, risk reporting, assurance and the questions that test whether controls are working.

What's included
  • Editable 28-slide executive presentation and facilitator guide
  • Briefing workbook and completion certificate
  • Risk reporting example: the same report done two ways
  • Governance scenario and assurance checklist

Risk Management Implementation Toolkit

For: Small and medium businesses, and whoever runs WHS in them

Editable risk register, risk matrix, assessment, change and review tools for running WHS risk management.

What's included
  • Risk register and editable risk matrix
  • Broad-brush, task risk assessment and JSA templates
  • Management of change and control verification tools
  • Implementation guide

Critical Control Management Leadership

For: Supervisors, team leaders and managersDuration: 3–4 hours

For supervisors and managers who verify critical controls in the field and act when one fails.

What's included
  • Editable 44-slide presentation and detailed facilitator guide
  • Four field verification scenarios from high-risk work
  • Field verification and control failure response tools
  • Completion certificate and training records

Critical Control Management Practitioner

For: Whoever is responsible for WHS or risk in your businessDuration: One day

A full day on bowtie analysis, selecting critical controls, performance standards and verification programs.

What's included
  • Editable 50-slide presentation and detailed facilitator manual
  • Full case pack and three worked critical control examples
  • Bowtie, critical control register (Excel) and performance standard templates
  • Assessments, completion certificate and training records

Working at Heights Awareness

For: All workersDuration: 20–30 minutes

For workers who use ladders, platforms, roofs or anything off the ground: why falls kill, and the order of controls that prevents them.

What's included
  • Editable slides with speaker notes, plus PDF
  • Facilitator guide and participant handout
  • Multiple-choice assessment with answer key
  • Attendance record form and certificate template

Cranes and Lifting Awareness

For: Workers on sites where cranes, hoists or lifting gear are usedDuration: 20–30 minutes

For workers on sites where loads are lifted: the lift plan, exclusion zones, checking lifting gear, and the rule that nobody goes under a suspended load.

What's included
  • Editable slides with speaker notes, plus PDF
  • Facilitator guide and participant handout
  • Multiple-choice assessment with answer key
  • Attendance record form and certificate template

Mobile Equipment and Vehicle Interaction Awareness

For: Workers on sites with forklifts, trucks, loaders or light vehiclesDuration: 20–30 minutes

For anyone who works around forklifts, trucks, loaders or utes: how people are hit by mobile equipment, and the habits that keep pedestrians and machines apart.

What's included
  • Editable slides with speaker notes, plus PDF
  • Facilitator guide and participant handout
  • Multiple-choice assessment with answer key
  • Attendance record form and certificate template

Isolation and Lockout Awareness

For: Workers who maintain, clean, clear or adjust plant and equipmentDuration: 20–30 minutes

For workers who clean, clear, maintain or adjust plant: why every energy source must be isolated, locked and proved dead before hands go in.

What's included
  • Editable slides with speaker notes, plus PDF
  • Facilitator guide and participant handout
  • Multiple-choice assessment with answer key
  • Attendance record form and certificate template

Asbestos Awareness

For: Workers in buildings, maintenance, trades and constructionDuration: 20–30 minutes

For anyone who could disturb asbestos without knowing it: where it hides, why it matters, and what to do before you drill, cut or break.

What's included
  • Editable slides with speaker notes, plus PDF
  • Facilitator guide and participant handout
  • Multiple-choice assessment with answer key
  • Attendance record form and certificate template

Emergency Evacuation Awareness

For: All workersDuration: 20–30 minutes

For every worker and regular contractor: what the alarms mean, how to evacuate, where to assemble, and what the wardens need from you.

What's included
  • Editable slides with speaker notes, plus PDF
  • Facilitator guide and participant handout
  • Multiple-choice assessment with answer key
  • Attendance record form and certificate template